Slope Stability Analysis in the Mining Area of PT Indocement Tunggal Prakarsa Tbk. Block X, Palimanan Quarry, Cirebon Plant Unit
DOI:
https://doi.org/10.51988/jtsc.v7i4.614Keywords:
Slope Stability, Safety Factor, Bishop Simplified Method, Rocscience Slide v6.0, Limestone QuarryAbstract
Open-pit limestone mining alters slope geometry and rock mass conditions, potentially reducing slope stability and increasing operational safety risks. Therefore, geotechnical evaluation is essential to ensure safe and sustainable mining activities. This study aimed to analyze the Factor of Safety (FoS) and slope stability of Quarry Palimanan Block X at PT Indocement Tunggal Prakarsa Tbk., Cirebon Plant Unit, and to validate the numerical analysis by comparing it with manual calculations using the Bishop method. A quantitative approach was employed based on the Limit Equilibrium Method (LEM) using the Bishop Simplified Method. Slope stability analysis was performed using Rocscience Slide v6.0 with input parameters including slope geometry, cohesion, internal friction angle, and unit weight obtained from field observations and company geotechnical data. The results showed that the FoS of Cross-Section A was 2.070 using Rocscience Slide v6.0 and 2.0724 using manual calculations, while Cross-Section B yielded FoS values of 2.709 and 2.7129, respectively. The difference between the two methods was less than 0.15%, indicating excellent consistency and high reliability of the numerical model. All FoS values exceeded the minimum stability criterion, indicating that both slopes were in a very stable condition with a low risk of failure. These findings demonstrate that Rocscience Slide v6.0 combined with the Bishop Simplified Method provides a reliable approach for evaluating slope stability in open-pit limestone mining.
References
[1] E. Hoek and E. T. Brown, “The Hoek-Brown failure criterion and GSI - 2018 edition,” J. Rock Mech. Geotech. Eng., vol. 11, no. 3, pp. 445–463, 2019, doi: 10.1016/j.jrmge.2018.08.001.
[2] R. T. Murniati, B. Purwoko, and M. K. Syafrianto, “Analisis kestabilan lereng pada tambang quarry di PT. Total Optimal Prakarsa (TOP), Desa Peniraman, Kalimantan Barat,” JeLAST J. Elektron. Laut, Sipil, Tambang, vol. 7, no. 3, pp. 1–6, 2020, [Online]. Available: https://jurnal.untan.ac.id/index.php/JMHMS/article/view/42828
[3] Y. Fanani, A. D. Astuti, and A. K. Paki, “Analisisi Kestabilan Lereng Tambang CV. Mutiara Timur Berdasarkan Faktor Keamanan,” Semin. Teknol. Kebumian dan Kelaut., vol. 3, no. 1, p. 278, 2021, [Online]. Available: http://ejurnal.itats.ac.id/semitan/article/view/1977/1754
[4] M. R. Amin and Y. D. G. Cahyono, “Analisis Kestabilan Lereng pada Tambang Batu Andesit CV. Empat Lima Desa Morang Kecamatan Kare Kabupaten Madiun Provinsi Jawa Timur,” Pros. SENASTITAN Semin. Nas. Teknol. Ind. Berkelanjutan, vol. 4, no. Senastitan Iv, pp. 1–9, 2024.
[5] M. P. Pangaribuan and N. Retongga, “Analisis Kestabilan Lereng Menggunakan Metode Rock Mass Rating (RMR) dan Slope Mass Rating (SMR) untuk Menentukan Faktor Keamanan Lereng Pada Tambang Tuf Desa Candirejo, Kecamatan Semin, Kabupaten Gunungkidul, Daerah Istimewa Yogyakarta,” J. Geosains dan Teknol., vol. 5, no. 3, pp. 171–190, 2023, doi: 10.14710/jgt.5.3.2022.171-190.
[6] A. Rachmansyah and F. Aprilia, “Type of Rockslide along the Ponorogo – Pacitan Roads, East Java, Indonesia,” Indones. Geotech. J., vol. 2, no. 3, pp. 31–38, 2023, doi: 10.56144/igj.v2i3.47.
[7] R. Rudiansyah, T. Sidqi, N. H. Kusumah, and I. M. Rezeki, “Analysis of Retaining Wall Calculation Using Manual Method and Plaxis Software on the Kuningan ( Cipasung ) – Majalengka ( Cikijing ) National Road Boundary Section STA . 51 + 850,” Construction, vol. 4, no. 11, pp. 2419–2436, 2025.
[8] R. Hidayat and N. B. Wibowo, “Pemodelan Kestabilan Lereng dan Penilaian Potensi Longsor Menggunakan Limit Equilibrium,” J. Fis. dan Apl., vol. 18, no. 1, p. 3038, 2022, doi: 10.12962/j24604682.v18i1.11890.
[9] A. R. Pratama and S. Syaiful, “Analisis Kestabilan Lereng Tambang Terbuka Batubara Menggunakan Metode Bishop yang Disederhanakan (Simplified Bishop Method),” J. Min. Insid., vol. 2, no. 1, pp. 12–21, 2021, doi: 10.32530/jmi.v2i1.45.
[10] I. G. B. D. Putra and A. Zaenuri, “Analisis Faktor Keamanan Kestabilan Lereng berdasarkan Parameter Geoteknik Tanah Lapukan,” J. Geofis. Eksplor., vol. 6, no. 2, pp. 115–125, 2020, doi: 10.23960/jge.v6i2.88.
[11] P. Kolapo, “An overview of slope failure in mining operations,” Hazards, vol. 2, no. 2, pp. 263–283, 2022.
[12] X. P. Kang, “3D limit equilibrium stability analysis of concave and convex slopes in plan,” Math. Probl. Eng., vol. 2022, p. 1625765, 2022.
[13] Y. Zhou, H. Liu, L. Zhang, and M. Zhang, “Topographic effects on three-dimensional slope stability analysis,” Water, vol. 12, no. 2, p. 615, 2020.
[14] L. Zabuski, “The influence of slope geometry on its stability: Spatial and plane analysis,” Arch. Hydro-Engineering Environ. Mech., vol. 65, no. 4, pp. 243–254, 2018.
[15] Kementerian Energi dan Sumber Daya Mineral Republik Indonesia, “Keputusan Menteri Energi dan Sumber Daya Mineral Nomor 1827 K/30/MEM/2018 tentang Pedoman Pelaksanaan Kaidah Teknik Pertambangan yang Baik,” 2018.
Downloads
Published
License
Copyright (c) 2026 Jurnal Teknik Sipil Cendekia (JTSC)

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.